Direction of use: for bonding pipe insulation & duct insulation:
- Before applying the surface should be clean, dry & free from dust, loose shavings, oil and grease.
- Stir APCOBONAD can before applying.
- Apply thin coat of APCOBOND 355B BZPE on the both surfaces, either with short hair brush or pressure feeding blade, “to get a uniform coat” using thick coat or too much glue not required, recommended not to use more than one coat.
- Wait a while to evaporate the complete solvent until the surface become dry to touch tacky with slight finger pressure for both surfaces and then press the two surfaces firmly together by applying normal pressure to get strong bonding.
Direction of use: for powder coated painted surfaces:
- Before applying the surface should be clean, dry & free from dust, loose shavings, oil and grease.
- Stir APCOBONAD can before applying.
- Apply thin coat of APCOBOND 355B BZPE on the powder coated, either with short hair brush or pressure feeding blade, “to get a uniform coat” using thick coat or too much glue not required, recommended not to use more than one coat.
- Wait a while to evaporate the complete solvent until the surface become dry to touch tacky with slight finger pressure for both surfaces and then press the two surfaces firmly together by applying normal pressure to get strong bonding.
Drying time / open time / Evaporating time:
- This time varies from 2 minutes to 5 minutes depending on thickness of layers of adhesive, substrate type, moisture and temperature.
Coverage:
The wet coverage of APCOBOND 355B BZPE is 10 SQM to 12 SQM per litre, subjected to applied film thickness, to get proper coverage always keep the container spout close to prevent the solvent evaporation.
Storage & Shelf life:
Store under covered, well ventilated area, protect from direct sunlight & high temperature (>30°C). self-life is up to 24 months in unopened container when stored as directed above.